MiBridge - Migração facilitada PLC/DCS
Weidmüller

MiBridge - Migração facilitada PLC/DCS

MiBridge - Migração facilitada PLC/DCS

Weidmüller

MiBridge - Migração facilitada PLC/DCS

Publicado: 22 de maio de 2024 · Categoria: Catálogos

MiBridge - Migração facilitada PLC/DCS

Deste documento

Migration solutions MiBridge Migration made easy From old to new PLC / DCS with minimised downtimes Why migration is needed Migration solutions avoid downtime and maintain productivity Due to continuous technological changes, PLC/ DCS systems become obsolete and need to be replaced with new models. Many industries in process and energy, such as Pulp & Paper, Water Treatment, Oil & Gas, Power Generation and Metal Manufacturing require PLC / DCS system updates with minimum downtimes. Migration is necessary due to the aging of the old system and becomes a priority when: the PLC or DCS manufacturer is discontinuing technical support and spare parts service for their system. the PLC or DCS is unable to interconnect with new or existing third-party systems and applications. the PLC or DCS cannot achieve the technical requirement (speed, reliability, scalability) of the new demands of the plants. Converting a legacy system to a modern platform allows for an opportunity to improve plant operation, eliminating obsolescence risk and accelerates progress. Rewiring from the controllers to sensors, and field devices can make replacement a lengthy and costly challenge. To save costs and increase plant availability, MiBridge can retain the existing wiring. THE LATEST TRENDS AND TECHNOLOGIES IN PLC/ DCS MIGRATION Request your free white paper! www.weidmueller.com/MiBridge In our latest whitepaper we give you an overview of the most important theses and state the reasons for the necessity...

Abrir o PDF